XTO GROUP INC · B2B

API 5CT 4-1/2 EUE R2 production tubing

Products for which XTO coordinates quotations on request. These technical references define requirements for review—not available stock, approved compatibility or a current commercial offer.

Reference specification

API 5CT 4-1/2 EUE R2 production tubing

Production tubing conducts fluids during well production. It is not drill pipe, casing or a drill bit. Selection depends on well conditions and approved engineering requirements, not diameter alone.

Reference specification

  • Buyer-required standard: API 5CT; not guaranteed certification
  • OD 4-1/2 in (114.3 mm)
  • EUE threaded and coupled ends, with protectors
  • Range 2 (R2); specify and verify individual joint lengths
  • Seamless (SMLS) preferred
  • J55, N80, L80 and P110: separate engineering alternatives

Consulted configuration: 12.75 lb/ft / approximately 6.88 mm wall, subject to documentary confirmation. This is one configuration, not a specification applicable to all grades or offers.

What to attach to the RFQ

  • MTC / EN 10204 3.1 and required hydrostatic / NDT test evidence
  • Mill identity, mill traceability and current API 5CT certificate with applicable scope
  • Confirmed OD, wall/weight, grade, lengths, end finish and connection details
  • Quality records, protectors, packing and buyer's engineering specification

Engineering must select each grade separately for the well service. Confirm certificate validity and scope, dimensions, tests and traceability against the offered mill and product. XTO does not claim an API license, guaranteed certification or confirmed stock.

Engineering, commercial terms and Venezuela review

Submit the destination, end user/end use, approved specification and requested Incoterm with the RFQ. Packaging, documentary obligations, timing and payment conditions are reviewed individually; the page is not a current price or delivery commitment. XTO coordinates sourcing—not crude sales or drilling execution.

Venezuela industrial supply guide · in Spanish

Trade compliance before commercial commitment

Before quoting or committing supply, review applicable trade sanctions and export controls, including OFAC and BIS requirements where relevant, the parties involved, destination, end user and end use, any required licenses, bank authorization and other import/export requirements. A general license must not be presumed to authorize a transaction: its scope, conditions and current applicability require case-by-case review with qualified advisers and the participating bank. An RFQ does not constitute clearance or a supply commitment.

Buyer questions

Is this drill pipe?

No. This reference is production tubing for fluid flow during well production, not drill pipe, casing or a drill bit.

Do 12.75 lb/ft and approximately 6.88 mm apply to every grade?

No. They describe one consulted configuration, subject to documentary confirmation. J55, N80, L80 and P110 must be evaluated as separate engineering alternatives.

Does API 5CT on this page guarantee certification?

No. API 5CT is a buyer requirement. The offered mill's current certificate, scope, traceability and product/test documentation must be verified.